An underground treatment plant is less intrusive to the surrounding living areas and more ecological. The wastewater treatment plant is being constructed in the bedrock of a 10-hectare area. The treatment plant will be taken into use in 2021 and for the time being we are on schedule,” says Petri Poikonen, FCG Planning Manager. The construction contractors have been selected and the concrete work should be complete in two years. Finally, partly overlapping with other phases, the devices and piping will be installed. At the moment, we are conducting detail design and the space has been excavated into the bedrock. We started the design work already eight years ago and preliminary design ten years ago. FCG is the main contractor in the Blominmäki wastewater treatment plant project. The multidisciplinary consulting company has diverse water know-how and makes use of state-of-the-art project management and design software. FCG Finnish Consulting Group Oy is the main contractor for the project. From 2021, it will treat the wastewater of around 400 000 of the city’s inhabitants. “All the largest wastewater treatment plants in Finland have been designed with Cadmatic.” – Petri Poikonen, Planning Manager Do you need design software that can handle massive 3D models without performance issues? Let us show you howĪn ecological wastewater treatment plant is currently being constructed close to the Finnish capital of Helsinki in Blominmäki, Espoo.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |